Download PDF | View documents on Sedar
Montreal, November 23, 2023 – Quebec Precious Metals Corporation (“QPM” or the “Company”) (TSX.V: QPM, OTCQB: CJCFF, FSE: YXEP) is pleased to announce that a drilling program is underway at the La Pointe Extension gold deposit, on the Company’s 100% owned Sakami project in the Eeyou Istchee James Bay territory of Quebec. Drilling aims to test the higher-grade portion of the La Pointe Extension deposit that could be amenable to open pit mining. The program totalling about 700 m in two holes (Figures 1 and 2) will be completed in early December with results available early next year.
Normand Champigny, QPM’s Chief Executive Officer, stated: “We expect that the drill results will connect the richest portions of the La Pointe Extension deposit and augment significantly the mineralized volume. There are still many undrilled targets in an interpreted large intrusive body near the deposit and over a strike length of 2.5 km to the southwest of the deposit. Drilling of these targets could result in a major discovery.”
La Pointe Extension Deposit
The La Pointe Extension deposit and the La Pointe deposit are part of the Sakami project located along a 23-kilometre-long favourable geological contact that hosts gold mineralization. Both deposits are of similar geological character and a sub-vertically dipping higher-grade portion. They show a generally good spatial correlation between the gold mineralization and the abundance of disseminated arsenopyrite, pyrite and pyrrhotite hosted in a silicified paragneiss that is observed in drill holes.
At the La Pointe deposit, the mineralized zone has a strike length 950 m, a depth of 450 m with an estimated average true thickness of 35 m, up to 63 m in the central part of the deposit. At the La Pointe Extension deposit discovered in 2020 (press release of April 21, 2020), drilling confirmed the continuity of a mineralized zone with a strike length of 2,000 m. Within the mineralized zone, there is a sub-vertically dipping higher-grade core with a strike length of 500 m strike, a depth of 600 m with an estimated average true thickness of 40 m, up to 75 m in the central part of the deposit. To date, a total of 47 holes (14,535 m) have intersected the La Pointe Extension deposit and the three of the most significant drill intersections are:
- Hole PT-20-151: 1.15 g/t Au over 80.1 m incl. 2.21 g/t Au over 24.85 m
- Hole PT-20-154: 1.14 g/t Au over 70.3 m incl. 2.74 g/t Au over 6.8 m
- Hole PT-21-177 : 2.15 g/t Au over 42.2 m incl. 5.17 g/t Au over 14.50 m
Complete assay results and calculated composite grades released to date are available on QPM’s website (https://www.qpmcorp.ca/en/projects/sakami/). For previously disclosed results in connection with the La Pointe and La Pointe Extension deposits, see press releases of June 9, 2021, November 2, 2021, February 24, 2022, March 10, 2022 and May 26, 2022.
The drilling program is under the supervision of GeoVector Management Inc. The drilling contract was awarded to Forage Val d’Or.
Qualified Person
Normand Champigny, Eng., Chief Executive Officer of the Company, and Qualified Person under NI 43-101 on standards of disclosure for mineral projects, has prepared and reviewed the content of this press release.
About Quebec Precious Metals Corporation
QPM is primarily focused on advancing its Sakami gold project, located in Eeyou Istchee James Bay territory in Quebec, near Newmont Corporation’s Eleonore gold mine. In addition, the Company holds a 68% interest in the Kipawa/Zeus rare earths project located near Temiscaming, Quebec. This is the only rare earths project in North America which has a fully completed feasibility study.
For more information please contact:
Normand Champigny
Chief Executive Officer
Tel.: 514 979-4746
nchampigny@qpmcorp.ca
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.
- April 03, 2024 Quebec Precious Metals and Harfang Exploration Jointly Identify High-Priority Gold and Lithium Drill Targets on their Sakami and Serpent-Radisson Projects, James Bay Region, Quebec
- February 29, 2024 Quebec Precious Metals Intersects 3.86 g/t Au over 8Â m and 2.37 g/t Au over 12.2Â m on its 100% owned Sakami Project
- January 18, 2024 Quebec Precious Metals Reports High-Grade Lithium up to 3.9% Li2O at Surface at the Drill-Ready Ninaaskumuwin Discovery, Situated along a 3.8 km-long, Highly Prospective pXRF Trend on its 100% Owned Elmer East Project, James Bay, Quebec
- January 16, 2024 Quebec Precious Metals summarizes 2023 progress and provides 2024 outlook
- December 19, 2023 Quebec Precious Metals Intersects Mineralized Zone at La Pointe Extension
- November 23, 2023 Quebec Precious Metals Drilling Higher Grade Mineralization at La Pointe Extension
- November 15, 2023 Quebec Precious Metals Confirms Drill Targets on Lithium Discovery, Elmer East Project, James Bay, Quebec
- November 07, 2023 Quebec Precious Metals Completes Lithium Prospecting Program, Expands Elmer East Project, James Bay, Quebec and Issues Shares in Payment of Debts and Deferred Share Units
- October 24, 2023 Quebec Precious Metals Announces the Discovery of Spodumene at the Elmer East Project, James Bay, Quebec
- October 11, 2023 Quebec Precious Metals Starts Prospecting on High Priority Lithium Targets, James Bay, Quebec
- September 20, 2023 Quebec Precious Metals Congratulates Harfang Exploration on its Spodumene Discovery near the Sakami Project, James Bay, Quebec
- August 22, 2023 Quebec Precious Metals Identifies High Priority Lithium Targets on James Bay Projects
- August 09, 2023 Quebec Precious Metals Grants Stock Options and Deferred Share Units, Issue Shares in Payment of Debts
- July 28, 2023 Quebec Precious Metals Closes Second and Final Tranche of $1.4 M Private Placement, Announces Results of Annual Shareholders Meeting, Appoints Geneviève Ayotte as director