Drilling Highlights of 2020 La Pointe Extension discovery Mineralization from surface up to a depth of 250 m over 1 km strike length and open in all directions Significant intersections are: PT-20-173 – 0.30 m at 60.80 g/t Au PT-20-162 – 42 m at 1.31 g/t Au PT-20-159 – 80 m at 1.10 g/t Au … Continue reading Quebec Precious Metals drilling returns High Grade at La Pointe Extension: 60.8 g/t Au over 0.3 m within 1.4 m at 15.01 g/t Au, initiates metallurgical testing
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed